Tuesday, 26 February 2013

Final Construction Drawings: Signed

Today was a very big day for us.

We finally signed off our Final Construction Drawings.

We received the final construction drawings about 2 weeks ago and since then we have been emailing Metricon with queries ranging from a missing window in the main bathroom to the height of Powerpoints and TV cables.

My advice to anyone at this stage of the building process is to allow a good week to read through the drawings. Even showing a few friends can help (sometimes), to help find things that may not be obvious.

I have to say that our joinery consultant Leo was amazing during this process. He found his own discrepancies and alerted us to a few issues. He also took the time to call us after hours to make sure we were happy with where he had allocated Powerpoints and cabling (where we have cabinets).

Leo definitely made us feel better about our choices.

It's amazing how you can look over a plan heaps of times and still find problems. We even found one small thing this morning! The Metricon team were very patient with us and I have to say we really did push them to the limit with changes!

I did want to add this piece of advice, when looking through the plans have a good think about how you are going to use the rooms and where the best place for Powerpoints etc will be. Above the bench tops, inside cabinetry? Are the Powerpoints ok to be poistioned at 1500mm off the ground or do you need them higher/lower? These were the little things that drove us mental.

So now we have been advised that our file has been handed over and we should have a start date very soon. I will be in touch with an update soon...


Wednesday, 30 January 2013

Permit Approved

Well we now officially have the green light from the Council. 

Our building permit came through a few days ago which is very exciting.

We have also had the Final Construction drawing come through. There were a few discrepancies the most surprising was having a window left out of the main bathroom.  Now you see it now you don't!

In our final contract there was a window but then in our Final Construction drawings there is no window!  It is not a huge drama, however I just found it weird that our paperwork goes through a QA department before being sent to drafting so this should have been picked up!  It also got us scared about what we might have missed!  So we are currently working through the drawings - with a fine tooth comb!

No more news on the property - just that we have ordered our second soil test so hopefully we should start building in about 5 weeks!

I will be in touch with more news soon.

Meanwhile below are some pictures of the Metricon Monarch Display Home.  Although we are not building this home in particular, the Whittaker does have the same floor plan. I like to remind myself from time to time that all the hard yards we put in now will pay off later...

Our home will be fairly similar with the same window configuration in the dining and family room. 

KITCHEN

DINING

BUTLER'S PANTRY

OUTDOOR AREA

KITCHEN/FAMILY ROOM


LEISURE ROOM - UPSTAIRS