Sunday, 17 November 2013

Day 240 - We have Keys!

We are very excited to announce after 235 days since we started building we received the keys to our dream home.

Such an exhausting day filled with lots of emotion. But so worth it.

We walked through the house with our Site Supervisor and most of the imperfections we found during our last walk through had been fixed. There were still a few things that were not finished, such as;

1. No ducted vacuum unit. Apparently the unit is always installed after handover as it is one thing tradies like to steal! 

(I think Metricon need to install security cameras on all their sites!)

2. Some of the walk in robe doors needed to be changed completely. Could have been done before settlement however they needed to wait on materials to be delivered!

I guess they were the two main things. This didn't stop handover though. As exciting as it was to get the keys I really thought we should have waited until all of these things had been completed. Reason being is now I have to organise times to be at home so that these things can be installed and fixed. Very annoying as I just don't have the time to sit around and wait for tradies to come....and we all know how that works!!

Our Site Supervisor has been fantastic. In fact he has helped me coordinate some of these tradies and has forced them to fit into my schedule. 

Not sure how other big volume builders work however our Site Supervisor is still looking after us for another month. So if there are any issues we can still call him to get things fixed which is very reassuring considering we have already noticed a few issues since getting the keys.

After three months Metricon will come and see us and check in on any issues we have had. Hopefully there will be no major issues, but again good to know that they will check the house.

I have a busy week ahead with curtains being installed during the week as well as more tradies coming to fix a few things at the house.  

Looking forward to settling in the house with the kids.  They are really excited to have their on rooms and space. After living on top of each other for the last few years it will be a big change for all of us.



Kids bathroom


Entrance


Dining room - love those windows!


Kid's entertainment/living area

Sunday, 3 November 2013

Day 226 - 1 Week Till Handover

Sorry for not updating you earlier, but things have been manic....especially with getting things organised for the house.

We had our final walk through last week. In the lead up to the walk through I read heaps of blogs about running through that all important last walk through before handover. 

So many things to take in. The one thing that seemed to come up a lot was to keep a running list of all the imperfections that you notice. Not just during the walk through but from Day 1. Also make sure you run through your plans and ensure that all those variations you made along the way have been adhered to. Especially any electrical or plumbing issues.

Before our walk through began our SS told us that he had walked through the house with a Metricon Area Manager and they had already picked up some small issues. 

Lucky for us we had our on private building inspector run through the house whilst we were there doing our final inspection. What we didn't pick up he did!! Let's just say that we would have had leaking toilets if our private inspector hadn't double checked the toilets after we did. 

This was not Metricon's fault though. Our SS told us that at the end of many builds there are some "tradies" that think it is ok to steal small parts and screws from the house. So between our SS surveying the house and us doing the walk through someone came through our house with "sticky fingers". 

Our walk through took 3hrs. A lot longer than I had planned. We just wanted it to be thorough. One of the things I liked about our SS taking us through was that he didn't really down play any of the issues we found. He was honest and made sure that everything we queried would be looked into. 

Obviously we will need to wait for handover to ensure that everything is sorted, but I do have faith that he will get the job done right.

With the handover creeping up on us we are yet to finalise all our white goods and I feel a little rushed. I guess the build had been so long in he making that now that we are finally here it just doesn't seem real!!

Like many other Metricon blogs I have read we also have heaps of purple (not red) dots around the house. I took heaps of photos to make sure I remembered where they all were!!

Metricon also provided us with a list of the issues we had. At handover we will walk through them all and make sure everything has been taken care of.

Looking forward to updating you next week after handover.